Construction project scheduling and control / Saleh Mubarak.
By: Mubarak, Saleh A. (Saleh Altayeb), author.
Call number: TH438.4 M83 2019 Material type: 
Item type | Location | Location | Call number | Copy number | Barcode | Status | Date due |
---|---|---|---|---|---|---|---|
![]() |
ODI General Collection | ODI General Collection | TH438.4 M83 2019 (Browse shelf) | 1 | 1000530182 | Available |
Includes bibliographical references (pages 559-566) and index.
"The success of Construction Project Scheduling and Control is in large part due to author Saleh Mubarak's comprehensive writing style that analyzes the complexities of scheduling through a step-by-step approach. The book introduces students to entirely new definitions and theories of the Critical Path Method (CPM), the leading scheduling method, as well as the most up-to-date information on Building Information Modeling (BIM). The new edition will include updated worked problems and scheduling software exercises, as well as revised teaching materials such as lecture slides and an instructor's manual"-- Provided by publisher.
There are no comments for this item.